Directory · Florida · Columbia County
Winfield Solid Waste Facility
Lake City, FL · Columbia County · Verified Nov 23, 2026
Winfield Solid Waste Facility is a landfill in Lake City, Columbia County, Florida, at 1347 NW Oosterhoudt Lane. It accepts Class III waste including construction and demolition debris, shingles, concrete, yard trash and furniture; Class I household and commercial waste; asbestos with notice; tires; scrap metal. Hours: Monday to Friday 7:00am to 4:30pm and the first Saturday of each month 7:00am to 4:30pm; closed Sunday. Published fees: Class III construction and demolition debris 46.50 dollars per ton, minimum 2.00 dollars under 60 pounds; Class I 65.50 dollars per ton. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Landfill |
|---|---|
| Operator | Columbia County |
| Address | 1347 NW Oosterhoudt Lane, Lake City, FL, 32055 · Directions |
| County | Columbia |
| Phone | 386-752-6050 |
| Website | https://www.columbiacountyfla.com/Landfill.aspx |
| Materials accepted | Class III waste including construction and demolition debris, shingles, concrete, yard trash and furniture; Class I household and commercial waste; asbestos with notice; tires; scrap metal |
| Materials not accepted | Not published |
| Restrictions | Asbestos and mobile homes need 24 hour notice. Payment cash, check or credit card. |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | Class III construction and demolition debris 46.50 dollars per ton, minimum 2.00 dollars under 60 pounds; Class I 65.50 dollars per ton (Fee source) |
| Pickup availability | Not published |
| Operating hours | Monday to Friday 7:00am to 4:30pm and the first Saturday of each month 7:00am to 4:30pm; closed Sunday |
| Permit information | Florida DEP permits 0009862-021-SO Class I and 0126302-013-SO Class III |
| Notes | One profile notes an expected closure year of 2026 from older EPA data; county page shows the facility operating with a 2026 holiday schedule, conflict flagged. |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.