Find where to take your construction load.

Directory · Missouri · Jasper County

Waste Corporation of Missouri Joplin Transfer Station

Joplin, MO · Jasper County · Verified Nov 23, 2026

Waste Corporation of Missouri Joplin Transfer Station is a transfer station in Joplin, Jasper County, Missouri, at 3700 West 7th Street. It accepts Solid waste. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.

Request a quote

Facility typeTransfer Station
OperatorWaste Corporation of Missouri Inc (GFL Environmental)
Address3700 West 7th Street, Joplin, MO, 64801 · Directions
CountyJasper
Phone417-623-6620
Websitehttps://wcawaste.com/about-wca/corporate-interior/state/mo
Materials acceptedSolid waste
Materials not acceptedNot published
RestrictionsNot published
Minimum quantityNot published
Commercial loadsYes
Residential loadsYes
Published feesNot published
Pickup availabilityNot published
Operating hoursNot published
Permit informationMissouri DNR transfer station permit 0409701, Active, open to public
NotesWeak C&D acceptance evidence: row rests on Missouri DNR permitted transfer station status only; no facility specific published list of accepted construction loads was read. Confirm before hauling. Note: Ozark Resource Recovery, a new construction and demolition only facility near I 44 Exit 15 in the Joplin area, states it is opening fall 2026 and is not yet a permitted operating facility in the DNR layer read; it is excluded from rows and documented in the notes file.
Information verifiedNov 23, 2026 (Listing source)

Ask this facility about your load

This facility has no email address on file, so a request sent here is saved but cannot be emailed to them. For a fast answer, call them at 417-623-6620.

Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.

Quote requests are paused today while we finish a site update. Please call the facility directly for a price today. The form returns this evening.

More in Jasper County

See every facility in Jasper County

See every facility in Missouri