Directory · Virginia · Suffolk
SPSA Regional Landfill
Suffolk, VA · Suffolk · Verified Nov 11, 2026
SPSA Regional Landfill is a landfill in Suffolk, Suffolk, Virginia, at 1 Bob Foeller Dr. It accepts Solid waste; construction and demolition debris; municipal solid waste; wastewater treatment plant sludge. Hours: Tuesday to Friday 7:00am to 4:00pm; closed Monday, Saturday and Sunday. Published fees: Construction and demolition material 60.00 dollars per ton in the FY26 preliminary schedule; contract non-municipal tip fee 62.00 dollars . Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Landfill |
|---|---|
| Operator | Southeastern Public Service Authority |
| Address | 1 Bob Foeller Dr, Suffolk, VA, 23434 · Directions |
| County | Suffolk |
| Phone | 757-539-9373 |
| Website | https://www.spsava.gov/ |
| Materials accepted | Solid waste; construction and demolition debris; municipal solid waste; wastewater treatment plant sludge |
| Materials not accepted | Not published |
| Restrictions | Primarily serves Suffolk, Chesapeake, Virginia Beach, Norfolk, Portsmouth, Franklin, Isle of Wight and Southampton; may receive waste from outside the primary service area |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | Construction and demolition material 60.00 dollars per ton in the FY26 preliminary schedule; contract non-municipal tip fee 62.00 dollars per ton (Fee source) |
| Pickup availability | Not published |
| Operating hours | Tuesday to Friday 7:00am to 4:00pm; closed Monday, Saturday and Sunday |
| Permit information | Solid Waste Permit 417 (Permit source) |
| Notes | Fee is a preliminary FY26 schedule adopted Apr 23 2025 for a May 28 2025 hearing; final adoption was not confirmed, so the fee is marked preliminary. ZIP conflict: city guidance gives 23434, a directory gives 23432. |
| Information verified | Nov 11, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.