Directory · Montana · Sheridan County
Sheridan County Landfill
Plentywood, MT · Sheridan County · Verified Nov 23, 2026
Sheridan County Landfill is a landfill in Plentywood, Sheridan County, Montana, at 201 Mann Road. It accepts Household and commercial garbage; demolition waste; asphalt and concrete; contaminated soils; mattresses; tires; metal and compost and untreated wood and brush at no charge when separated. Hours: Tuesday to Friday 11:00 am to 4:00 pm; Saturday 8:00 am to 4:00 pm; closed Sunday and Monday and holidays. Published fees: 20.00 dollars per cubic yard for demolition waste. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | landfill |
|---|---|
| Operator | Sheridan County Solid Waste District |
| Address | 201 Mann Road, Plentywood, MT, 59254 · Directions |
| County | Sheridan |
| Phone | 406-765-7117 |
| Website | https://www.sheridancountymt.gov/landfill |
| Materials accepted | Household and commercial garbage; demolition waste; asphalt and concrete; contaminated soils; mattresses; tires; metal and compost and untreated wood and brush at no charge when separated |
| Materials not accepted | Regulated hazardous waste |
| Restrictions | Check in at the entrance gate; fees are subject to change by the Solid Waste Board; closed in bad weather per county summary |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | 20.00 dollars per cubic yard for demolition waste (Fee source) |
| Pickup availability | Not published |
| Operating hours | Tuesday to Friday 11:00 am to 4:00 pm; Saturday 8:00 am to 4:00 pm; closed Sunday and Monday and holidays |
| Permit information | MT Minor Class II facility and landfarm; permit SW-0017-01 per sources read; EPA LMOP ID 21025 (Permit source) |
| Notes | A county page description in one directory summary listed demolition at 15.00 dollars per yard which conflicts with the current 20.00 dollars per cubic yard rate in the county fee summary read; the 20.00 dollar rate is rowed |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.