Directory · Minnesota · Norman County
Norman County Demolition Landfill
Gary, MN · Norman County · Verified Nov 23, 2026
Norman County Demolition Landfill is a demolition landfill in Gary, Norman County, Minnesota, at 3291 County Road 19. It accepts Construction materials; demolition materials; earth; rocks; concrete; bricks; untreated lumber; plaster; sheetrock; shingles; metals; glass; plastic building parts. Hours: Saturdays 8:00 AM to 1:00 PM April to December in county page summary; an older listing showed 8:00 AM to 2:30 PM April to December. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Demolition landfill |
|---|---|
| Operator | Norman County |
| Address | 3291 County Road 19, Gary, MN, 56545 · Directions |
| County | Norman |
| Phone | 218-784-2069 |
| Website | https://www.normanmn.gov/departments/environmental_services/solid_waste/solid_waste_management_facilities.php |
| Materials accepted | Construction materials; demolition materials; earth; rocks; concrete; bricks; untreated lumber; plaster; sheetrock; shingles; metals; glass; plastic building parts |
| Materials not accepted | Household garbage; hazardous waste; liquid waste; paints and solvents; used engine oil; propane tanks; auto hulks |
| Restrictions | Seasonal Saturday operation; appointment may be available through the county contact |
| Minimum quantity | Not published |
| Commercial loads | Not published |
| Residential loads | Yes |
| Published fees | Not published |
| Pickup availability | No |
| Operating hours | Saturdays 8:00 AM to 1:00 PM April to December in county page summary; an older listing showed 8:00 AM to 2:30 PM April to December |
| Permit information | Demolition landfill; permit number not published in sources read |
| Notes | Demolition landfill class is direct construction and demolition acceptance evidence. Address conflict: county and directory sources show both Gary on Highway 19 west of Highway 32 and 3291 County Road 19 near Ada; the County Road 19 address from place listings for the same site is used and the conflict is flagged. Hours conflict noted. |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.