Directory · South Carolina · Horry County
Horry County Landfill
Conway, SC · Horry County · Verified Nov 23, 2026
Horry County Landfill is a landfill in Conway, Horry County, South Carolina, at 1886 Highway 90. It accepts Solid waste; mixed construction debris; shingles; clean wood; concrete, brick, dirt and asphalt; land clearing debris; yard waste; special waste by evaluation. Hours: Monday to Friday 6:00 AM to 4:30 PM; Saturday 6:00 AM to 2:30 PM per secondary listing; confirm with authority. Published fees: Effective July 1 2026: solid waste 47.50 dollars per ton; mixed construction debris 47.50 dollars per ton; shingles 47.50 dollars per ton; . Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Landfill |
|---|---|
| Operator | Horry County Solid Waste Authority |
| Address | 1886 Highway 90, Conway, SC, 29526 · Directions |
| County | Horry |
| Phone | (843) 347-1651 |
| Website | https://www.solidwasteauthority.org/landfill.html |
| Materials accepted | Solid waste; mixed construction debris; shingles; clean wood; concrete, brick, dirt and asphalt; land clearing debris; yard waste; special waste by evaluation |
| Materials not accepted | Not published |
| Restrictions | Concrete pieces must be less than 4 by 6 feet. Contamination load fee and prohibited load fee apply. Special waste needs evaluation before delivery. |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | Effective July 1 2026: solid waste 47.50 dollars per ton; mixed construction debris 47.50 dollars per ton; shingles 47.50 dollars per ton; clean wood 22.00 dollars per ton; concrete, brick, dirt and asphalt 15.00 dollars per ton; land clearing debris 22.00 dollars per ton; special waste 50.00 dollars per ton (Fee source) |
| Pickup availability | Not published |
| Operating hours | Monday to Friday 6:00 AM to 4:30 PM; Saturday 6:00 AM to 2:30 PM per secondary listing; confirm with authority |
| Permit information | Class 3 permit 261001-1102 and Class 2 permit 261001-1201 per secondary facility profile |
| Notes | STRONG evidence: authority fee schedule names construction material rates in plain words. No facility email published in sources read. |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.