Directory · North Carolina · Lee County
GFL Sanford Transfer Station
Sanford, NC · Lee County · Verified Nov 17, 2026
GFL Sanford Transfer Station is a transfer station in Sanford, Lee County, North Carolina, at 3290 McDonald Dr. It accepts Construction and demolition wastes. Hours: Monday through Friday 7:00 AM to 4:00 PM. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Transfer Station |
|---|---|
| Operator | GFL Environmental |
| Address | 3290 McDonald Dr, Sanford, NC, 27330 · Directions |
| County | Lee |
| Phone | 919-775-1443 |
| Website | https://gflenv.com/sanford-transfer/ |
| Materials accepted | Construction and demolition wastes |
| Materials not accepted | Not published |
| Restrictions | Not published |
| Minimum quantity | Not published |
| Commercial loads | Not stated separately in the source read |
| Residential loads | Not stated separately in the source read |
| Published fees | Not published |
| Pickup availability | Not published |
| Operating hours | Monday through Friday 7:00 AM to 4:00 PM |
| Permit information | Not published |
| Notes | Lee County has no county landfill and no permitted C&D landfill in operation. The county FAQ names two transfer stations authorised to receive construction and demolition wastes, GFL and Waste Management, and this row uses GFL as the first listed. Phone conflict: the county FAQ gives 919-775-1443 while a GFL place listing gives 910-423-4122, so the county number is used here. Hours and coordinates come from a place listing, not from the GFL branch page, which gave no hours. No itemised materials list and no fee were found. The proposed Liberty Waste Solutions C&D landfill at 1751 Colon Road, Sanford, is not a row: franchise hearing was October 20 2025, expected opening January 2027, and no DEQ permit to operate was found. |
| Information verified | Nov 17, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.