Directory · New York · Cortland County
Cortland County Landfill
McGraw, NY · Cortland County · Verified Nov 16, 2026
Cortland County Landfill is a landfill in McGraw, Cortland County, New York, at 4708 Town Line Rd. It accepts Municipal solid waste; residential solid waste; construction and demolition debris. Hours: Mon-Fri 8:00 AM-3:30 PM. Published fees: $105 per ton (businesses); annual permit $30 per vehicle for businesses, $10 per vehicle for residents; $10 minimum charge; white goods $2 . Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Landfill |
|---|---|
| Operator | Cortland County Division of Solid Waste |
| Address | 4708 Town Line Rd, McGraw, NY, 13101 · Directions |
| County | Cortland |
| Phone | 607-756-8077 |
| Website | https://www.cortland-co.org/280/Solid-Waste |
| Materials accepted | Municipal solid waste; residential solid waste; construction and demolition debris |
| Materials not accepted | Large dead animals; compressed gas tanks; junked automobiles; septage; burning or hot loads; used motor oil; wet or lead acid batteries; fuel contaminated soil; friable asbestos; liquid wastes; sludge without a permit |
| Restrictions | Only wastes generated in Cortland County; landfill permit required; safety vests must be worn if unloading on the open face; one vehicle on the open face at a time unless directed otherwise |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | $105 per ton (businesses); annual permit $30 per vehicle for businesses, $10 per vehicle for residents; $10 minimum charge; white goods $2 per item (Fee source) |
| Pickup availability | Not published |
| Operating hours | Mon-Fri 8:00 AM-3:30 PM |
| Permit information | Landfill permit required under Local Law 6 of 2024; flow control Local Law 4 of 2017 directs all municipal solid waste and all construction and demolition debris generated in Cortland County to this landfill (Permit source) |
| Notes | County page lists a single $105 per ton business rate and does not publish a separate C&D per ton rate, so the fee is the general rate, not a C&D specific rate. C&D acceptance is explicit in the flow control notice and in the commercial and private business permit descriptions on the county page. |
| Information verified | Nov 16, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.