Directory · North Carolina · Cherokee County
Cherokee County MSW Landfill
Marble, NC · Cherokee County · Verified Nov 17, 2026
Cherokee County MSW Landfill is a municipal solid waste landfill in Marble, Cherokee County, North Carolina, at 10160 US Highway 19. It accepts Municipal solid waste and construction and demolition debris. Hours: Monday to Friday 7:30 AM to 4:00 PM, Saturday 7:30 AM to 12:00 PM, closed Sunday. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Municipal Solid Waste Landfill |
|---|---|
| Operator | Cherokee County |
| Address | 10160 US Highway 19, Marble, NC, 28905 · Directions |
| County | Cherokee |
| Phone | 828 837 2621 |
| Website | http://www.cherokeecounty-nc.gov/ |
| Materials accepted | Municipal solid waste and construction and demolition debris |
| Materials not accepted | Hazardous waste, liquids |
| Restrictions | Waste generated in Cherokee County only at time of 2016 inspection; service area listed as Cherokee, Clay, Graham and Swain Counties |
| Minimum quantity | Not published |
| Commercial loads | Not published |
| Residential loads | Yes |
| Published fees | Not published |
| Pickup availability | Not published |
| Operating hours | Monday to Friday 7:30 AM to 4:00 PM, Saturday 7:30 AM to 12:00 PM, closed Sunday |
| Permit information | Life of Site Permit 2002-MSWLF-1998, Phases 1 to 5 issued July 7 2020 (Permit source) |
| Notes | C and D acceptance rests on a DEQ evaluation from 2000 stating C and D goes into the Subtitle D MSW cell because the county has no separate C and D landfill, plus a RecycleSearch listing C and D as accepted. No current county page naming C and D acceptance was found, so this is weak evidence. The only fee found was 57.00 dollars per ton in a 2014 annual report, which is stale, so fees are blank. A secondary page reviewed October 10 2026 claims 80 dollars per ton, but it was not verified from a county source, so it is not used. A DEQ inspection from 2016 lists an email for Jeff Clark, but the current director in 2020 was Rob Ward with no email published, so contact email is left blank. Hours in the 2020 DEQ inspection end at 4:00 PM weekdays, while a place listing ends at 3:45 PM, so hours need a call to confirm. |
| Information verified | Nov 17, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.