Directory · Minnesota · Mower County
Austin Transfer Station
Austin, MN · Mower County · Verified Nov 23, 2026
Austin Transfer Station is a transfer station in Austin, Mower County, Minnesota, at 102 28th Street SE. It accepts Municipal solid waste; demolition material such as sheetrock, siding and shingles. Hours: Monday to Friday 8:00 AM to 4:00 PM; 1st and 3rd Saturday 8:00 AM to 12:00 PM. Published fees: Solid waste 89.26 dollars per ton plus tax for commercial haulers; small load minimum 20.00 dollars plus tax; uncovered load fee 10.00 . Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Transfer station |
|---|---|
| Operator | City of Austin; operated by Thompson Sanitation under 2024 lease in sources read |
| Address | 102 28th Street SE, Austin, MN, 55912 · Directions |
| County | Mower |
| Phone | 507-437-4606 |
| Website | https://www.ci.austin.mn.us/public-works/solid-waste-transfer-station |
| Materials accepted | Municipal solid waste; demolition material such as sheetrock, siding and shingles |
| Materials not accepted | Paint; oil; batteries; hazardous waste; yard waste; dead animals |
| Restrictions | Open to the public in city sources |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | Solid waste 89.26 dollars per ton plus tax for commercial haulers; small load minimum 20.00 dollars plus tax; uncovered load fee 10.00 dollars (Fee source) |
| Pickup availability | No |
| Operating hours | Monday to Friday 8:00 AM to 4:00 PM; 1st and 3rd Saturday 8:00 AM to 12:00 PM |
| Permit information | MPCA Permit SW-222 in Mower County Solid Waste Plan 2023 to 2033 (Permit source) |
| Notes | Address conflict in sources: 100, 102 and 103 28th Street are all shown; 102 28th Street SE is used from the operator listing. Fee conflict: 2024 lease showed residential 86.56 dollars per ton and commercial 88.16 dollars per ton and demolition 12.00 dollars per cubic yard, while the October 2026 directory summary showed 89.26 dollars per ton for commercial haulers. Phone conflict: 507-433-1702 also listed. |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.